PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavated area between G-K and 5 Line  Facing North (800x600).jpg Rebar mats for Elev. 4-Stair -2 Facing North (800x600).jpg Setting up the Shear Wall panels at Elev. 5-6 2nd floot Facing South-East (800x600).jpg Rebar mats for Elev. 4-Stair -2 Facing West (800x600).jpg Setting Rebar mats at Elev. 4-Stair -2 Facing North-East (800x600).jpg
Previous page Setting Rebar mats at Elev. 4-Stair -2 Facing North-East (800x600)
Setting Rebar mats at Elev. 4-Stair -2 Facing North-East (800x600)